Rail Users Ireland Forum

Rail Users Ireland Forum (http://www.railusers.ie/forum/index.php)
-   Dublin Waterford (http://www.railusers.ie/forum/forumdisplay.php?f=51)
-   -   Additional track Cherryville Junction to Kilkenny (http://www.railusers.ie/forum/showthread.php?t=3500)

crypto 17-12-2007 20:23

Additional track Cherryville Junction to Kilkenny
 
Hello,

New member, apologies for the forthcoming n00bish questions. There was clearly an second track from Cherryville Junction to Kilkenny at one stage, I was wondering when this was lifted?

Secondly, is there any suggestion of relaying this (second) track? I understand that the throughput of the current line probably doesn't justify an additional line. However, surely journey times would be improved, not to mention reliability. All of the bridges appear to support an additional track, and I would assume I.E. own the property along the route. I was stuck in Carlow for several minutes recently waiting for an incoming train, these kinds of delays would be eliminated with an additional track, one would assume. Surely the cost would be cheaper per km that say reopening the WRC, as there wouldn't be the cost of eliminating level crossings etc?

On a separate note, is there any section of the line which would be a candidate for re-alignment a la the current work at Portalington?

Thanks.

Thomas J Stamp 18-12-2007 11:49

hummmmmmm.......... as an exercise in baying to the mob it's time for a poll.

closes at 5.pm this evening!!

packetswitch 18-12-2007 15:35

Overwhelming mandate for causing physical harm to Mr. Gleeson.

Colm Moore 18-12-2007 16:37

Without going to the trouble of doubling the whole darn thing, we should do what they do in the USA - passing loops that are several km long, although admittedly, their trains are sometimes several km long.

Mark Gleeson 18-12-2007 16:48

Quote:

Originally Posted by packetswitch (Post 28596)
Overwhelming mandate for causing physical harm to Mr. Gleeson.

I think not, I'll send the heavies around your place later for suggesting such :D

Mark Hennessy 18-12-2007 17:01

Hi crypto,

Welcome to the board.

This is an infrastructure question and usually goes in our members section.

I have little doubt that this section will not be doubled any time in the future.
IE may improve services to Carlow when the Kildare Route Project doubling the amount of tracks to Sallins is completed.

I'll lock this thread now.

Thomas J Stamp 18-12-2007 17:01

Quote:

Originally Posted by Mark Gleeson (Post 28602)
I think not, I'll send the heavies around your place later for suggesting such :D

methinks mrG may have swaped a few votes.

anyhow, the pitchfork brigade have spoken!!!


All times are GMT. The time now is 18:09.

Powered by vBulletin
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.