Galway-Limerick slow speeds
Took the train from Galway to Limerick today and back, excruciating slow. I was curious why the trains go so slow, as most of the line is straight and level. There were several times when the train was crawling along at 5mph on straight track for no reason. This is a problem throughout the entire network, but Galway to Limerick seems to be the worst, can someone explain to me why this is?
|
the enginneers wont sign it off ! simple as that:(
|
Quote:
|
Quote:
The two main factors on this route appear to be curvature and level crossings. |
The NRA wouldn't get away with it, would they? If a section of HQDC or motorway was limited to 40mph for no good reason indefinitely somebody would be making a fuss. I bet if IE was separate track and operating the operating side wouldn't be shy about telling passengers it was infrastructure's fault.
|
Quote:
|
The speed limits are due to numerous level crossings with substandard sighting distances due in part vertical and horizontal curvature. Absolutely no discretion or exemptions are allowed as this is considered a new route.
The line was never built for passenger services and combined with a very boggy foundation has serious restrictions. The line was reopened on the cheap to keep politicians happy, the consultants report looked at basically a new line from Limerick to Oranmore but came back at 600 million to 1 billion depending on spec/route. |
Quote:
|
The line was opened solely to shut up some politicians and local interests who were under the impression the line would be some kind of amazing solution to the west of Ireland's problems. It failed miserably to meet the very low passenger number targets.
The solution chosen by Government was the cheapest possible option to reopen the line, the fanciful 1 billion for a new line were ruled out. All investment proposals for the line where investigated and ALL failed to meet the minimum standard to justify investment, despite this the line was reopened The line was originally built on the cheap in the Victorian era to transport cattle and sugar beet. In order to make up the massive operating loss as a result of the line opening the Waterford Rosslare line which carried 3 times more passengers per train than Ennis - Athenry was axed. |
the thing about Waterford/rosslare was the population wasnt big enough for starters plus trains were ran at peak commuting times and often ran empty !
i agree little or no promotion was done on it , connections at each end should been better also the speeds on the line were quite good! |
Waterford Rosslare had an average load of 20+ per train, 30-40 minutes faster than car
Ennis - Athenry is currently averaging 7, 30-40 minutes slower than car |
ive been on that train more than 10 times isnt alot at stages i was the only person on-board and there was never over 15 when i was on -board.....
|
Just to prove how crazy up and down, left right the WRC is
http://www.flickr.com/photos/finnyus...57629698779844 http://www.flickr.com/photos/finnyus...7629698779844/ This has a massive impact on sighting distance and train performance and imposes unavoidable speed limits |
For what its worth, I think its time to end the argument about the Ennis-Athenry line, for better or worse the boat on its reopening has long sailed.
Are the few people who use the route now rail users or not and have they no less right to be represented by the RUI. Its all well and good saying I told u so but the line is open and now the focus must be on getting it to work. First, there seems to be a fixation in Ireland with line speed vs cars, in my experience people with cars (unless commuting into a city centre) would rather eat their hat then use a train, when visiting friends in Ennis they always offer to drive to Limerick, thinking I'd have to be daft to get the train. I use trains because I have no car but like to move around. There are in my experience 3 things this or any other line in Ireland needs to boost numbers and attract passengers. 1. More services, people, especially young people like the idea of turning up whenever and getting a train wherever, do you think the DART would carry 10% of its current passngers with only 10% of the services. All routes should have an hourly service, especially now we have railcars. Connections, If I travel Waterford Limerick I have to wait a long time in Lmk Jctn for a train ???? The Dublin Galway train should connect nicely with the Athenry-Ennis service, they want to stop the Limerick Nenagh service, the last time I was tried to get it my Train from Ennis( the first for two hours) missed it by a matter of minutes. Time trains to arrive at junctions together and leave together. Try to go Cobh- Midleton, it takes over an hour outside peak. Trains. Commuter sets are not ideal for Waterford Galway, its not as if they need the Density, Train Travel on 2200s or mark 4 is so much more comfartable, couldnt some railcars be modified for "regional work" to have a better set up for this route. |
One last point, we are the only Country to my knowledge where the Government subsides express busses running the same route as trains while many large population centres have no bus service to speak of.
|
technically Expressway is not subsidised. Not directly, at least.
|
http://www.irishtimes.com/business/s...line-1.1463500
Quote:
|
Quote:
|
Bit hypocritical to be firing at Galway-Limerick. Don't remember ever reading about one of those trains turning back because it ran out of customers, as the Nenagh branch (or "LGV Kelly") has done at Birdhill from time to time as I understand.
|
Quote:
|