![]() |
[2-11-2007]Failed 7.42 from balbriggan
The 7.42 train failed at laytown, The next trains were delayed and the 7.57 had door trouble at both balbriggan and donabate
|
Can I ask is this paricular train the 29000 sets.
|
That would have been a 29k.
It is important to note the 29k is only about 20 times more reliable than a 2600, it is the most reliable diesel powered train in Europe if not the world |
Wow no wonder I like those trains. Mark do you have any news on the Rosslare/Gorey line with the new 22000 train on the line twice in one week. I seen a Korean person on Thrusday travelling on the new train in Wexford. The inside really nice much better than the photos well done IARNROD EIREANN
|
All times are GMT. The time now is 15:26. |
Powered by vBulletin
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.