Rail Users Ireland Forum

Go Back   Rail Users Ireland Forum > Search Forums
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read

Showing results 1 to 17 of 17
Search took 0.00 seconds.
Search: Posts Made By: gm101
Forum: Gorey-Arklow-Wicklow Line 03-08-2009, 22:49
Replies: 6
Views: 23,133
Posted By gm101
Rosslare ferry connections

Question Did the rosslare train ever connect in with the ferry in rosslare if yes is the answer when??
Forum: General Irish Rail Discussion 13-01-2009, 12:41
Replies: 4
Views: 4,221
Posted By gm101
central taffic control cannot bypass the driver...

central taffic control cannot bypass the driver to make annoucements on any train there is no such feature on the train radio on any rolling stock
Forum: General Irish Rail Discussion 12-01-2009, 13:09
Replies: 48
Views: 22,334
Posted By gm101
i am all for the control of the entire network to...

i am all for the control of the entire network to be controlled from a central point
what i want to ask is about the part of the above post you cut namely the running of an unmanned rail system had...
Forum: General Irish Rail Discussion 11-01-2009, 22:24
Replies: 48
Views: 22,334
Posted By gm101
i

i
Forum: Up To Date Travel Information 18-08-2008, 20:32
Replies: 15
Views: 9,971
Posted By gm101
ah i have to say you guys on this site make me...

ah i have to say you guys on this site make me laugh a train derailed and
you talk about will people get a refund on there ticket of course they will
get a refund .That there was no mention of it on...
Forum: Longford-Maynooth-Dunboyne-Clonsilla-Dublin line 25-05-2008, 12:47
Replies: 9
Views: 12,085
Posted By gm101
i must correct you on this but all the procedures...

i must correct you on this but all the procedures were not followed if the train spaded a signal it must remain in the place were it stopped the train
cannot move to a platform unless permission was...
Forum: Longford-Maynooth-Dunboyne-Clonsilla-Dublin line 21-04-2008, 16:47
Replies: 56
Views: 35,839
Posted By gm101
the point being with this special working in...

the point being with this special working in place trains can only run at a limted speed which slows down an already slow process its frustrating i know but safety is the main concern
Forum: Longford-Maynooth-Dunboyne-Clonsilla-Dublin line 21-04-2008, 16:40
Replies: 56
Views: 35,839
Posted By gm101
just to clear this the generator would have no...

just to clear this the generator would have no effect on this problem the limits or the abilties of the system do not come into question when you have a fault like this there are strict procedures to...
Forum: Longford-Maynooth-Dunboyne-Clonsilla-Dublin line 20-04-2008, 18:40
Replies: 56
Views: 35,839
Posted By gm101
thats not really true the generator only comes...

thats not really true the generator only comes into effect when there is a mains power failure that fault was a link failure with the remote interlockings which is very serious and rare fault and...
Forum: All stops to Thurles 14-03-2008, 16:14
Replies: 22
Views: 28,985
Posted By gm101
its more than just a little work i dont want to...

its more than just a little work i dont want to bore you with technical
things but your talking new signalling /track circuits/axel counters/crossover/ caws/etc aswell. its a whole lot of work im...
Forum: All stops to Thurles 11-03-2008, 11:59
Replies: 22
Views: 28,985
Posted By gm101
the branch line from heuston joins the sligo line...

the branch line from heuston joins the sligo line at glasnevin jct but there is no line that connects branch line with the docklands line
Forum: All stops to Thurles 10-03-2008, 16:32
Replies: 22
Views: 28,985
Posted By gm101
theres no line that runs from heuston to the...

theres no line that runs from heuston to the docklands station
Forum: DART 06-03-2008, 18:06
Replies: 7
Views: 10,177
Posted By gm101
just a quick point to make over seapoint its not...

just a quick point to make over seapoint its not irish rail who wont upgarde
seapoint station its the residents that have posed an objection since planning for this staion was first sought check it...
Forum: Dublin Belfast 13-02-2008, 15:48
Replies: 12
Views: 22,325
Posted By gm101
all 2900 class railcars that work northern...

all 2900 class railcars that work northern commuter services are fitted with t.p.w.s which is n.i.r required safety equipment.the problem is that the fleet is still to small
Forum: General Irish Rail Discussion 13-02-2008, 15:38
Replies: 21
Views: 15,936
Posted By gm101
the ticket checkers that work on the sligo line...

the ticket checkers that work on the sligo line also work as guards if need be or if there is a problem with the train they can act as a second man so they do have a purpose and of course to catch...
Forum: General Irish Rail Discussion 13-02-2008, 12:05
Replies: 21
Views: 15,936
Posted By gm101
i for one think irish rail as a whole do a great...

i for one think irish rail as a whole do a great job i think there could be improvements of course but i also put this down to under investment by the government that investment only started to be...
Forum: General Irish Rail Discussion 12-02-2008, 15:50
Replies: 21
Views: 15,936
Posted By gm101
crowded trains why complain???????

why do people always complain about over crowded trains???? name one train system in the world that does not have over crowded trains at peak times
Showing results 1 to 17 of 17

 
Forum Jump

All times are GMT. The time now is 12:15.


Powered by vBulletin
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.