Quote:
Originally Posted by Navan Junction
By giving out the T21 figure (through deduction), by saying the T21 budget was inadaquate and innaccurate
|
Well this is one of the points I've been making since T21 launched. There is no publicly available list of projects, timetables, costs or specifications. It is:
"Railway to Navan" instead of:
"Railway to Navan, double track with stations at ..........; park & ride at ........: to commence construction in ..... and to open to the public in .....; operations with diesel railcars"