View Single Post
Unread 18-11-2010, 23:12   #16
Kilocharlie
Member
 
Join Date: Oct 2006
Posts: 395
Default

Quote:
Originally Posted by Mark Gleeson View Post
There is a higher cost in maintaining the track, though there is no physical restriction permitting an increase to 100mph in the future. The plan was for all Hazelhatch-Heuston to be 29k operated which are restricted to 70mph
But there are trains such as the 0505 from Westport, 0515 from Athlone, 0535 from Limerick and the 0735 for Portlaoise that only stop at Hazelhatch. Should there not use the fast line rather than be slowed unnecessarily by the speed limit? Of course only usin gone platform makes life easier for both the passengers and the staff.
Kilocharlie is offline   Reply With Quote