View Single Post
Unread 31-10-2015, 17:39   #62
EnterpriseUser
Member
 
Join Date: Dec 2005
Posts: 60
Default

It was hard to see as all the passengers were corralled on the platform while the train sets were connected and the doors were tested. (I was at the very front to board the "A" carriage) I have to say I was both surprised and impressed as service resiliency has never been a feature of the Enterprise service. I was even more surprised that a full catering service was available (this crew are Dublin based). The 22000 set has worked well, operating three round trips a day with superior acceleration to the DD sets and while not as comfortable work well: if we ever achieved the nirvana of an hourly service a 22000 five carriage set in addition the the DD sets would be perfectly acceptable.
EnterpriseUser is offline   Reply With Quote