View Single Post
Unread 17-02-2012, 14:32   #6
Carrage A
Regular Poster
 
Join Date: Dec 2010
Posts: 30
Default

Quote:
manning level crossings and signals
Are the signals not controlled from Dublin and in regaurds to Waterford it would require one person to man two level crossings as if a few weeks the third level crossing willl be going automatic.
Carrage A is offline   Reply With Quote