View Single Post
Unread 27-02-2014, 11:55   #31
shweeney
Regular Poster
 
Join Date: Mar 2006
Posts: 180
Default

Quote:
Originally Posted by Mark Gleeson View Post

There are in fact some plans to do something around Greystones also (was in the DART plan of 1996 but the passing loop and station at Redford was never built)
I assume this would be a passing loop south of the tunnel (there isn't space to double the track all the way into the station)? Would only really help slightly when trains are running late, as I can't see them increasing the frequency to Greystones.
shweeney is offline   Reply With Quote