View Single Post
Unread 05-11-2013, 05:20   #19
Colm Moore
Local Liaison Officer
 
Colm Moore's Avatar
 
Join Date: Dec 2006
Posts: 5,442
Default

Permission granted

http://www.dublincity.ie/swiftlg/apa...esults%3C/a%3E
Quote:
Decision: GRANT PERMISSION
Decision Date: 23-Oct-2013
Type Short Desc
Condition 1. Standard Permission Condition including Further Information (26th September 2013)

Condition 2. The proposed train station and footbridges bridges shall be as proposed in the drawings as originally received by the planning authority on the 31 January 2013

Condition 3. The open and accessible nature of the train station shall be reviewed regularly

Condition 4. The station and footbridges shall be of high quality and durable materials and finishes.

Condition 5. The following requirements of the City Councils Roads and Traffic Planning Division shall be fully complied with in the proposed development:

Condition 6. The following requirements of the City Councils Drainage Division shall be fully complied with in the proposed development:

Condition 7. The final design of the proposed development, including relevant operational, environmental and property matters, shall be agreed with Waterways Ireland prior to the construction phase

Condition 8. The landscaping along the northern boundary between the park (at Ashington) and the railway line shall be reconfigured and re-landscaped at the applicants expense

Condition 11. The following requirements of the City Councils Air Quality and Noise Pollution Control Unit shall be fully complied with in the development:


Condition C340 Hours of Work (see Development Plan para 15.37.0)

Condition C350 Noise Levels

Condition C370 Street Cleaning during Demolition and Construction

Condition Before this development commences, a financial contribution in the sum of Euro shall be paid by the Applicant to Dublin City Council under Section 48 of the Planning and Development Acts 2000-2011.
__________________
Colm Moore is offline   Reply With Quote