View Single Post
Unread 10-04-2015, 15:44   #5
Jamie2k9
Really Really Regluar Poster
 
Join Date: Jun 2010
Posts: 2,146
Default

Centrally Controlled crossings can spend anywhere from 2.5-3.5 minutes down. I suspect that many can be even longer such as ones on the Cork line north and south of Limerick J which generally have a train in either direction passing within a minute or two of one another.

Automatic crossings should be put in places where manual ones are slowing down trains.
Jamie2k9 is offline   Reply With Quote