Thread: New Timetable
View Single Post
Unread 04-11-2009, 16:40   #125
chris
Regular Poster
 
Join Date: Dec 2007
Location: Cambridge
Posts: 131
Default DART

Can the DART clockface timetabling (/15 Minuten Takt, as I am hoping will catch on in Hiberno-English) be run by the existing fleet without cutting capacity on individual trains? or are they relying on additional trains cutting the loads?
chris is offline   Reply With Quote