View Single Post
Unread 12-01-2007, 21:03   #6
Oisin88
Member
 
Oisin88's Avatar
 
Join Date: May 2006
Location: Dublin
Posts: 608
Default

Quote:
It's a shame really because in any other country in the Europe that branch would have 10 trains a day in either direction at least.
If they ran a railcar from Limerick to Nenagh and re-opened the old spur to Birr with some sort of Delta junction at Nenagh then maybe the government could sort out 2 problems (aparently nobody wants to decentralise to Birr because it is so Isolated) It would still be magnificently slow.

They are building an eco village in Cloughjordan in the next few years, which you would think would increase rail usage.

But then I amn't an engineer/economist/etc.

Last edited by Thomas J Stamp : 16-01-2007 at 15:27.
Oisin88 is offline   Reply With Quote