View Single Post
Unread 29-11-2012, 20:26   #23
ACustomer
Really Regular Poster
 
Join Date: Jan 2006
Posts: 767
Default

It would be foolish to frame timetables where trains had to acheve absolute maximum performance in every section, ( no allowance for TSRs or the occasional need to use the wheelchair ramps) so I don't agree with the complaints about the Waterford line times. From my experience they are reasonably tight: remember that the advantage from 100mph v 80mph over a 10 to 12 mile section is not goimg to be very much.

Waterford -Dublin is 110 miles of which nearly 80 is on single track. Dublin-Belfast is 113 miles, virtually all double track. Many Waterford trains are timed at 2.10 or 2.15 for 6 or 7 stops; Belfast trains usually take 2.10 or 2.15for 4 or 5 stops. Given the size of the cities involved, I know which route needs to be shaken uop.
ACustomer is offline   Reply With Quote