Isn't the Maynooth line electrification taking place in tandem with the City centre resignalling
Quote:
'I understand, from the Minister, that Iarnród Éireann intend to undertake the resignalling and the removal of level crossings on the Maynooth line in the period 2009-2012 and that the electrification of the line will progress in tandem with the resignalling.'
|
http://www.ainebrady.com/news.htm/news/id/373
Quote:
Originally Posted by Dempsey
The detailed planning and design of the upgrade works on the Maynooth line is a matter for Iarnród Éireann. I understand that Iarnród Éireann intend to undertake the resignalling and the removal of level crossings on the line in the period 2009-2012 and that the electrification of the line will progress in tandem with the resignalling. These projects will provide for a significant increase in trains per hour from 7 currently to 17 trains per hour. When completed the Maynooth line will become an integral part of the DART network.
|
Isn't the resignalling going ahead?