View Single Post
Unread 20-10-2015, 08:33   #8
Inniskeen
Really Regular Poster
 
Join Date: Oct 2010
Posts: 951
Default

Quote:
Originally Posted by Mark Gleeson View Post
Good news I can confirm the second bridge will be opened for all passengers in coming months.

It was previously planned as an emergency bridge. The RSC confirmed to us that it will be opened to all passengers as part of the on going works
Very odd that it would be planned as an emergency bridge. When the turnback facility is commissioned at Grand Canal Dock it will be very common for two trains to be dis-embarking on the island platform simultaneously. Assuming both trains drop a few hundred passengers there will be considerable conngestion even with both narrow footbridges operational. I suspect that an addutional exit will be required to the north onto Barrow Street.
Inniskeen is offline   Reply With Quote