View Single Post
Unread 03-09-2009, 13:40   #42
Charlie Hungerford
Regular Poster
 
Join Date: Aug 2009
Posts: 37
Default

Quote:
Originally Posted by irishsaint View Post
if one of the loco's then, that is in belfast is being fitted with nir signalling, that could be used to pull one of those orange buckets of rust parked in dundalk? potentially a temporary 3rd set?
Those rust buckets are actually two full MK3 sets with Citygold coaches and dining cars. IE have multiple options regarding motive power with which to haul them, including:

* Either of the 201s being fitted in Belfast with the UK signalling gear;
* Borrowing 112 from NIR, which has both signalling systems fitted.

The first option probably involves a slight delay but they could easily get going on recommissioning the coaches by using the 071 trapped in Drogheda to haul them to Drogheda depot.

They have spare locos, spare carraiges, spare manpower, spare facilities and still Irish Rail prove that they really should be called Irish Fail.
Charlie Hungerford is offline   Reply With Quote