I think that list of level crossings listed between the stations really illuminates the extent of the problem on the Western half of the line.

What I would love to see considered is that the section between Nenagh and Limerick be closed temporarily while those level crossings are upgraded. The Nenagh to Ballybrophy section isnt that bad. The speeds could be increased on that section relatively easily.

8 CX level crossings. Obviously it would have to be reviewed on a gate by gate basis but automating some of them and bridging some of them would be the major works this line needs to become a viable line.

Close the section from Nenagh to Limerick while those works are being carried out. Would be great if it could be considered.

Any green party members reading this pass on the suggestion to Eamon Ryan :-)