Quote:
Originally Posted by Mark Gleeson
Good news I can confirm the second bridge will be opened for all passengers in coming months.
It was previously planned as an emergency bridge. The RSC confirmed to us that it will be opened to all passengers as part of the on going works
|
Very odd that it would be planned as an emergency bridge. When the turnback facility is commissioned at Grand Canal Dock it will be very common for two trains to be dis-embarking on the island platform simultaneously. Assuming both trains drop a few hundred passengers there will be considerable conngestion even with both narrow footbridges operational. I suspect that an addutional exit will be required to the north onto Barrow Street.