Quote:
Originally Posted by Mark Gleeson
There are in fact some plans to do something around Greystones also (was in the DART plan of 1996 but the passing loop and station at Redford was never built)
|
I assume this would be a passing loop south of the tunnel (there isn't space to double the track all the way into the station)? Would only really help slightly when trains are running late, as I can't see them increasing the frequency to Greystones.