Big picture:
* Has the revised track at GCD been done?
* Where are we with the city-centre signalling system?
* A fare matrix needs to be compiled and ticket machines programmed.
* What rolling stock?
* Passenger information systems need re-doing.

Little picture:
* Do all stations from Heuston to Kildare have validators?
* Can the ticket machines at those stations sell / to-up Leap Cards?
* Route maps need re-doing.
Top two (track and resignalling works) are in progress due for completion later in the summer - latest stage was completed over June Bank Holiday.

Fare matrix is already there - the existing one will just have to be integrated into the ticket machines - full suburban destinations added on both sides (Connolly and Heuston).

Rolling stock - ICRs cascaded by re-introduction of full Mark IV fleet and return of ICR from Belfast route and some minor rejigging.

PIS - No new stations so it *should* work, but given the issues in the past who knows?

The four stations to Hazelhatch are all fully LEAP compatible given they already are within the Short Hop zone.

LEAP PAYG won't be used beyond Hazelhatch so it's not so big an issue.

Route maps would, one would hope, be in the planning stage.