Quote:
Originally Posted by corktina
but the Limerick to Galway bit is fatally flawed in that it has had a lot of cash invested in it (and surely isnt likely to get more one hopes!) but is slower than the road (by a lot) and dearer than the Bus.(by a lot).
|
Well you can either pay a large subsidy to an inefficient operator or a smaller subsidy to an efficient operator.