Default 2019 Train performance

Looking at the IE homepage twitter feed there seems to be almost daily cancellations of scheduled DARTS (usually a North/Southbound plus the returning South/Northbound working). Invariably this is due to "operational reasons", which covers a multitude of possibilities. Crew shortages?

Looking at train performance data, there appears to have been a steady deterioration in punctuality month by month from January to March. Is the new timetable putting such demands on rolling stock that maintenance and reliability are slipping?
ACustomer is offline   Reply With Quote
Unread 28-03-2019, 21:24   #2
Jamie2k9
Really Really Regluar Poster
 
Join Date: Jun 2010
Posts: 2,146
Default

DART is driver issues.
Jamie2k9 is offline   Reply With Quote
Unread 29-03-2019, 07:33   #3
berneyarms
Really Regular Poster
 
Join Date: Aug 2013
Posts: 602
Default

Quote:
Originally Posted by ACustomer View Post
Looking at the IE homepage twitter feed there seems to be almost daily cancellations of scheduled DARTS (usually a North/Southbound plus the returning South/Northbound working). Invariably this is due to "operational reasons", which covers a multitude of possibilities. Crew shortages?

Looking at train performance data, there appears to have been a steady deterioration in punctuality month by month from January to March. Is the new timetable putting such demands on rolling stock that maintenance and reliability are slipping?
Unless I am misreading things, DART punctuality dropped in February but rose back up in March so I’m not sure where you’re getting the basis of your “steady deterioration in punctuality”?

Jan 93.3%
Feb 90.4%
Mar 95.1%

All of which are ahead of 2018.
berneyarms is offline   Reply With Quote
Unread 29-03-2019, 09:10   #4
ACustomer
Really Regular Poster
 
Join Date: Jan 2006
Posts: 767
Default

Berneyarms: I should have made it clearer that my second paragraph was intended to refer to all services, not just DART: For example the successive monthly punctuality (Jan-March 2019) for Dublin-Cork was 95.3, 85.2, 83.4; Dublin-Galway was 96.8, 90.6, 89.6; Dublin-Westport was 95.9, 92.5, 88.8.

Of course this was not consistently the case for all (sometimes relatively minor) routes, but even the 3 cases quoted are significant, especially as you might expect worse figures for a mid-winter month such as January.
ACustomer is offline   Reply With Quote
Unread 30-03-2019, 10:09   #5
Jamie2k9
Really Really Regluar Poster
 
Join Date: Jun 2010
Posts: 2,146
Default

Quote:
Originally Posted by ACustomer View Post
Berneyarms: I should have made it clearer that my second paragraph was intended to refer to all services, not just DART: For example the successive monthly punctuality (Jan-March 2019) for Dublin-Cork was 95.3, 85.2, 83.4; Dublin-Galway was 96.8, 90.6, 89.6; Dublin-Westport was 95.9, 92.5, 88.8.

Of course this was not consistently the case for all (sometimes relatively minor) routes, but even the 3 cases quoted are significant, especially as you might expect worse figures for a mid-winter month such as January.
I know there was a lot of engineering works on Cork route however dipping to 83% when there is a 10 minute leeway plus an extra 5 minutes in schedule. 15 minutes and coming out with results like that needs urgent action.

There was at least 3-5 days of heavy disruption around Sallins and Kildare. Additionally on GalwayWestport there was I think two freight train failures and as well as an incident.
Jamie2k9 is offline   Reply With Quote
Unread 31-03-2019, 09:41   #6
ACustomer
Really Regular Poster
 
Join Date: Jan 2006
Posts: 767
Default

Jamie2k9: I don't quite buy the extensive engineering works excuse/explanation. These works mean that there are revised timetables to take account of them: failure to meet revised schedules is not really acceptable.

There are approximately 900 Cork-Dublin and Dublin-Cork intercity trains per month. A 12 percentage point deterioration in punctuality means about 100 extra trains being late. IE have a case to answer here.
ACustomer is offline   Reply With Quote
Unread 31-03-2019, 13:03   #7
Jamie2k9
Really Really Regluar Poster
 
Join Date: Jun 2010
Posts: 2,146
Default

Quote:
Originally Posted by ACustomer View Post
Jamie2k9: I don't quite buy the extensive engineering works excuse/explanation. These works mean that there are revised timetables to take account of them: failure to meet revised schedules is not really acceptable.

There are approximately 900 Cork-Dublin and Dublin-Cork intercity trains per month. A 12 percentage point deterioration in punctuality means about 100 extra trains being late. IE have a case to answer here.
Remember after engineering works there is usually a temporary speed restriction for 4-7 days in many cases.

There are currently 4 TSR on Heuston-Cork, 2 on Cork-Heuston and they have been on rolling basis (different areas) for a few weeks now. Westport/Galway have had the same in recent weeks.

You are correct the performance is particularly bad and yes something needs to be done to address it.
Jamie2k9 is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 09:13.


Powered by vBulletin
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.