Default [11/01/2010] Temporary Service Changes from Monday Jan 11 2010

Quote:
07.10hrs Waterford to Heuston & 07.40hrs Waterford to Heuston will be amalgamated with capacities of both trains combined, and operate to the 07.40hrs Waterford to Heuston schedule throughout. All other services on this route will operate to the normal schedule.

11.05hrs Galway to Heuston cancelled. All other services on the route will operate to the normal schedule.
Its claimed

Quote:
As a precautionary measure to ensure service reliability, Iarnród Éireann is temporarily ceasing the practice of "splitting and joining" trains during the day, as extreme cold conditions outside of the depot environment can expose the control and mechanical systems of train couplers to faults.
However the split/combine operation still applies on the Dublin Galway/Westport OR is a change of train involved at Athlone, Irish Rail seem to be contradicting themselves. Can't understand the problem in Waterford

Last edited by Mark Gleeson : 10-01-2010 at 19:44.
Mark Gleeson is offline   Reply With Quote
Unread 10-01-2010, 17:07   #2
ACustomer
Really Regular Poster
 
Join Date: Jan 2006
Posts: 767
Default

When the current timetable came in, there were complaints that they did not publish a comprehensive timetable book. Now it looks like a good idea, as any such book would be pretty useless, considering the number of alterations.

The Dec 2009 timetable seems to have been very ill-thought out in many respects. Evidence of serious deficiencies in the operations department.

The amalgamation of the Waterford trains would seem to me to have more to do with the inadequacy of the 3-car formation on the 0710. The cold weather is just a smokescreen, as evidenced by the continuation of splitting on the Galway and Westport trains.
ACustomer is offline   Reply With Quote
Unread 10-01-2010, 19:46   #3
Thomas J Stamp
Chairman/Publicity
 
Thomas J Stamp's Avatar
 
Join Date: Dec 2005
Location: The Home of Hurling
Posts: 2,708
Default

are not the control and mechanical mechanisms exposed in every 2X3 car 22k set up, which is how a substantial element, if not the majority element of how the 22k fleet is deployed in any event?

whose job is it to join these trains up?
__________________
We are the passengers
Thomas J Stamp is offline   Reply With Quote
Unread 10-01-2010, 21:03   #4
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

If the hatch door was working the coupler would be protected from the ice and snow, alas the doors are either missing or won't open

Driver is in charge, but the process is a matter of seconds to complete
Mark Gleeson is offline   Reply With Quote
Unread 10-01-2010, 21:24   #5
dowlingm
Really Really Regluar Poster
 
dowlingm's Avatar
 
Join Date: Aug 2006
Location: Toronto, Canada
Posts: 1,371
Default

I hear there's an iceberg off the coast. Wouldn't surprise me if it decided to whip down the North Sea and take out Malahide Viaduct because that's the year IE are having. In theory adverse conditions on the roads should mean bumper traffic for IE but instead the infrastructure and fleet teams have no plan or if they do no resources to implement it. I wonder how IE was doing in 1982 the last time the country really ground to a halt.

It seems to me that the IE withdrawal from service projections included having 2 more 6 x 22k but when they had to be binned IE never bothered rewriting their withdrawal from service schedule - if they had, surely 2 x 6 x Mk3PP would still be available for, for instance, Waterford or Carlow commuter. No doubt the PPs are being "stored" in a similar vein to hauled car 7156 - open to the elements.
dowlingm is offline   Reply With Quote
Unread 11-01-2010, 01:02   #6
Kilocharlie
Member
 
Join Date: Oct 2006
Posts: 395
Default

Quote:
Originally Posted by Mark Gleeson View Post



However the split/combine operation still applies on the Dublin Galway/Westport OR is a change of train involved at Athlone, Irish Rail seem to be contradicting themselves. Can't understand the problem in Waterford
Probably got to do with points; the 0710 bypasses Kilkenny using the curve a few miles from Kilkenny. By amalgamating the 0710 and 0740 and going via Kilkenny it avoids having to keep two sets of points clear.
Kilocharlie is offline   Reply With Quote
Unread 11-01-2010, 07:37   #7
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

But that has nothing to do with the excuse given
Mark Gleeson is offline   Reply With Quote
Unread 13-01-2010, 20:41   #8
Kilocharlie
Member
 
Join Date: Oct 2006
Posts: 395
Default

This morning the Galway/Westport train was a 3-car and the on-board display said it was from Galway. Presumably Westport passengers change at Athlone?
Kilocharlie is offline   Reply With Quote
Unread 13-01-2010, 20:42   #9
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

Presumably but not notice given
Mark Gleeson is offline   Reply With Quote
Unread 13-01-2010, 21:32   #10
Oisin88
Member
 
Oisin88's Avatar
 
Join Date: May 2006
Location: Dublin
Posts: 608
Default

The 11:05 was a strange one to cancel from Galway. This train was also on the old timetable, and, if I am not mistaken, leaves a huge 4 hour gap in the middle of the day. Anytime I have been on it it is relatively busy, at least from Tullamore to Dublin, and is always sold out of sandwiches.
__________________
!
Oisin88 is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 13:57.


Powered by vBulletin
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.