Unread 09-03-2015, 08:42   #1
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default [article] Phoenix Park Tunnel

Bit of a strange way to learn about this

http://www.sdublincoco.ie/sdcc/depar....aspx?id=46317

Grand Canal Dock confirmed as terminus
Mark Gleeson is offline   Reply With Quote
Unread 09-03-2015, 10:12   #2
Kilocharlie
Member
 
Join Date: Oct 2006
Posts: 395
Default

Interesting...

4 trains per hour from Portlaoise/Kildare peak will some timetabling if intercity services are not to be delayed. Current service is one train per hour with a few extras thrown in around peak hours. Unless, of course, they mean that some will operate to/from Newbridge.
Kilocharlie is offline   Reply With Quote
Unread 09-03-2015, 10:15   #3
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

Info from Irish Rail this morning is 4 trains in the morning/evening peak, not 4 trains an hour.

Lots of confusion need to get some timetable clarity.

Ideally they should start a 3 train an hour Hazelhatch to Grand Canal Dock service, simple and allows for connections into services at Hazelhatch

Can then run all the Portlaoise services non stop Hazelhatch Heuston
Mark Gleeson is offline   Reply With Quote
Unread 09-03-2015, 10:42   #4
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

And more

http://www.independent.ie/irish-news...-31051427.html
Mark Gleeson is offline   Reply With Quote
Unread 09-03-2015, 12:09   #5
Jamie2k9
Really Really Regluar Poster
 
Join Date: Jun 2010
Posts: 2,146
Default

Quote:
Info from Irish Rail this morning is 4 trains in the morning/evening peak, not 4 trains an hour.

Lots of confusion need to get some timetable clarity.

Ideally they should start a 3 train an hour Hazelhatch to Grand Canal Dock service, simple and allows for connections into services at Hazelhatch

Can then run all the Portlaoise services non stop Hazelhatch Heuston
Not sure Hazelatch serves that needed, I think Portlaoise-Hazelhatch and onto GCD. Numbers beyond Hazelhatch cannot possibly justify such a service and then a shuttle to Heuston from Hazelhatch.

Cannot see IE going to stop all IC services at Hazelhatch.

As for the delays to Portlaoise, it happens but not overly major, perhaps better use of Sallins loop would help rather than holding. Remember the commuter service has enough timetabled in to absorb delays so expect it would be no different going to GCD.

Last edited by Jamie2k9 : 09-03-2015 at 12:13.
Jamie2k9 is offline   Reply With Quote
Unread 09-03-2015, 12:18   #6
James Howard
Really Really Regluar Poster
 
James Howard's Avatar
 
Join Date: Aug 2009
Location: Sligo Line
Posts: 1,115
Default

They should probably look at doing something similar on Maynooth after Luas BXD opens. The peak-time service would work a lot better if the local traffic between Clonsilla and Broombridge was served by Dunboyne trains only and passengers could swap between Luas, Connolly and Docklands services at Broombridge.

This would obviously require better Luas / Irish Rail fare integration which isn't terribly likely but one can dream. Hopping off a Longford train at Broombridge and transferring to a tram for Stephen's Green would be a much more attractive option than the long walk from Connolly.

We could quite quickly have something that starts looking like an integrated transport system if Irish Rail get the details right.
James Howard is offline   Reply With Quote
Unread 09-03-2015, 13:07   #7
comcor
Really Regular Poster
 
Join Date: Dec 2005
Location: Cork-Dublin, Cork Commuter and occasionally DART and Dublin-Wexford
Posts: 855
Default

Are these going to stop at Platform 10 in Heuston?
comcor is offline   Reply With Quote
Unread 09-03-2015, 13:48   #8
Kilocharlie
Member
 
Join Date: Oct 2006
Posts: 395
Default

That would be the intention but some trackwork would be required first as east bound trains cannot at present visit P10 and return to the correct track.
Kilocharlie is offline   Reply With Quote
Unread 09-03-2015, 13:57   #9
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

No mention of that work anywhere which is concerning.

P10 sucks if you rely on Heuston currently, need to get the 145 terminus moved down there as a starting point.

Q2/3 2016 is optimistic, Phase 2 of the resignalling will be done by then opening the 3rd platform in Grand Canal Dock, but the Tara Street/Connolly area is unlikely to be finished
Mark Gleeson is offline   Reply With Quote
Unread 09-03-2015, 14:04   #10
berneyarms
Really Regular Poster
 
Join Date: Aug 2013
Posts: 602
Default

The plan as I understand it does include installing a crossover north of platform 10 to allow for trains bound for Grand Canal Dock to serve platform 10 and then switch tracks.

And most definitely the 145 will have to be extended up to the turning circle once more. There would still be a large volume of people leaving the train at Heuston for the immediate surrounding area and along the Quays.
berneyarms is offline   Reply With Quote
Unread 13-03-2015, 12:30   #11
shweeney
Regular Poster
 
Join Date: Mar 2006
Posts: 180
Default

GCD is very busy in the mornings already, with the potential for 3 trains to arrive at once when the new platform is open, are there any plans to improve access routes in the station (the bridge seems to be a real bottleneck).
shweeney is offline   Reply With Quote
Unread 13-03-2015, 12:48   #12
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

GCD is a real problem alright. I have seen talk of an exit at the north end but nothing detailed.

It's currently close to being unsafe
Mark Gleeson is offline   Reply With Quote
Unread 14-03-2015, 09:04   #13
Inniskeen
Really Regular Poster
 
Join Date: Oct 2010
Posts: 951
Default

Passenger flow and platform congestion are potentially an issue at all the city centre stations to one degree or another. Pearse is the best equipped to cope with additional traffic, Tara Street is restricted both in terms of platform surface area and access. Connolly likewise can be congested, particularly in respect of platform 6 & 7 arround the access ramp.

The Phoenix Park tunnel trains will probably be modestly loaded by the time they reach Grand Canal Dock but will obviously put pressure on already unsatisfactory access arrangements.
Inniskeen is offline   Reply With Quote
Unread 15-03-2015, 11:24   #14
shweeney
Regular Poster
 
Join Date: Mar 2006
Posts: 180
Default

Quote:
Originally Posted by Inniskeen View Post
Passenger flow and platform congestion are potentially an issue at all the city centre stations to one degree or another. Pearse is the best equipped to cope with additional traffic, Tara Street is restricted both in terms of platform surface area and access. Connolly likewise can be congested, particularly in respect of platform 6 & 7 arround the access ramp.

The Phoenix Park tunnel trains will probably be modestly loaded by the time they reach Grand Canal Dock but will obviously put pressure on already unsatisfactory access arrangements.
Northern line trains will also be terminating at GCD once the new platform is complete.
shweeney is offline   Reply With Quote
Unread 15-03-2015, 12:44   #15
ThomasJ
Member
 
ThomasJ's Avatar
 
Join Date: Dec 2005
Location: Clonsilla
Posts: 2,812
Default

So, has the north strand- entrance into Connolly been resolved?

At the moment we can have waits into Connolly because the track used to enter Connolly has to he shared with northbound services , has this / will this be sorted when this happens?

The last thing you want is maynooth trains stuck at glasnevin junction waiting on inbound Kildare trains, then stuck again at north strand!
ThomasJ is offline   Reply With Quote
Unread 15-03-2015, 12:46   #16
ThomasJ
Member
 
ThomasJ's Avatar
 
Join Date: Dec 2005
Location: Clonsilla
Posts: 2,812
Default

Quote:
Originally Posted by shweeney View Post
Northern line trains will also be terminating at GCD once the new platform is complete.
And maynooth trains I hope.
ThomasJ is offline   Reply With Quote
Unread 15-03-2015, 13:17   #17
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

Quote:
Originally Posted by ThomasJ View Post
The last thing you want is maynooth trains stuck at glasnevin junction waiting on inbound Kildare trains, then stuck again at north strand!
Not really as you have parallel movement when you have a Maynooth line Docklands service and a Park Tunnel train
Mark Gleeson is offline   Reply With Quote
Unread 15-03-2015, 13:25   #18
ThomasJ
Member
 
ThomasJ's Avatar
 
Join Date: Dec 2005
Location: Clonsilla
Posts: 2,812
Default

Ah okay.

But what about the stretch of track from drumcondra into Connolly? Will that be sorted?
ThomasJ is offline   Reply With Quote
Unread 15-03-2015, 14:18   #19
berneyarms
Really Regular Poster
 
Join Date: Aug 2013
Posts: 602
Default

Quote:
Originally Posted by ThomasJ View Post
Ah okay.

But what about the stretch of track from drumcondra into Connolly? Will that be sorted?
It will be sorted by a timetable recast and the resignalling at Connolly.

There is plenty of space to operate 4 extra trains during the peak - really this is a non-issue.
berneyarms is offline   Reply With Quote
Unread 16-03-2015, 14:47   #20
Jamie2k9
Really Really Regluar Poster
 
Join Date: Jun 2010
Posts: 2,146
Default

Just out of general interest, could Glassnavan junction be reconfigured to allow Drumcondra bypass access to the tunnel. Long term surly something like this would be required as service levels will increase long term. While DART underground will happen at some point, this could be needed at some stage or will both lines feeding into Connolly restrict.

I don't know the junction really well but couldn't the embankment between Sligo and tunnel line be knocked and crossovers moved West to connect both lines.

Operationally I think it could be an impotent part for Heuston services as while not overly common services get suspended through Drumcondra for various reasons so I don't think suspending Heuston services is acceptable while it may not be often.

Perhaps could benefit Heuston bypass Drumcondra and Maynooth/Sligo left as they are but Connolly could be the problem.

Last edited by Jamie2k9 : 16-03-2015 at 14:49.
Jamie2k9 is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 19:29.


Powered by vBulletin
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.