The only reason that all came about was because of this
Quote:
In the weeks following a presentation to the Joint Oireachtas committee on transport by Platform 11 the Joint Committee travelled through the tunnel on a standard suburban railcar type train and following this at a later Joint Oireachtas committee sitting Iarnród Éireann finally conceded that the tunnel could be used and following the construction of a new station in Spencer Dock services will commence between Kildare and Spencer Dock.
|
Due to us and no one else the Joint Committee where brought out on a 2700 railcar and taken from Connolly to Heuston, that was a powerful victory and a vindication
Irish Rail conceeded it was doable, which was a total reversal of their position, they had to admit it was possible. It pissed them off no end
While IE have back tracked on it there is a study underway which will force the issue