No mention of that work anywhere which is concerning.
P10 sucks if you rely on Heuston currently, need to get the 145 terminus moved down there as a starting point.
Q2/3 2016 is optimistic, Phase 2 of the resignalling will be done by then opening the 3rd platform in Grand Canal Dock, but the Tara Street/Connolly area is unlikely to be finished
|