|
10-07-2008, 23:30 | #1 |
Really Regular Poster
Join Date: Jan 2008
Location: Dublin
Posts: 309
|
Its been 4 years now since those horrible bright green commuter railcars arrived on the wexford line.they've outstayed their welcome. time for the new 22ks to be introduced NOW. or put some mark 3 trains on this line in the meantime because there must be free sets available with all the 22ks being introduced on every other flippin line
|
11-07-2008, 11:54 | #2 |
Chairman/Publicity
Join Date: Dec 2005
Location: The Home of Hurling
Posts: 2,708
|
funny you should say that since there are some funny movements of mark3 push pulls recently.
|
11-07-2008, 12:03 | #3 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
But Mk3 coaches are not suitable for the Rosslare line, few problems with platforms, locomotives, and accessibility
The new trains are ordered curiously a few weeks after we had a meeting with IE, there are staff training issues due to the ongoing shortage of staff, combined with a delay in the trains arriving means they missed the 2008 timetable. There is a huge change coming in December 2008 current Rosslare timetable is merged with Dublin suburban so you can't use Mk3 coaches Whats killing Rosslare is the horribly slow journey and dodgy frequencies not the trains
__________________
Unhappy with new timetable - let us know |
11-07-2008, 23:21 | #4 | |
Really Regular Poster
Join Date: Jan 2008
Location: Dublin
Posts: 309
|
Quote:
What's this? |
|
11-07-2008, 23:27 | #5 |
Really Regular Poster
Join Date: Mar 2007
Location: Rosslare Line
Posts: 600
|
MK3's on Rosslare no way!!.... That doesnt happen
Last edited by KSW : 11-07-2008 at 23:30. |
12-07-2008, 11:11 | #6 |
Technical Officer
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
|
There is a trip to the Wexford Opera each year non stop to Wexford, Mk2 coaches have done it as well
Platforms are too short at many stations, the 22k fleet is supposed to have selective door opening which gets around that. Wexford is the longest platform in the country btw Since the Rosslare line fleet is accessible to current standards, going back to Mk3 coaches would be a very significant step back. The Mk3 is a great coach but unless some serious refurbishment is done you really want to avoid them. They are falling apart at the moment. Air conditioning is joke, the wheels are end of life, doors are giving trouble, push pull systems suspect. Irish Rail are dumping them, we have filed protests but no change. All well and good have a comfortable seat, but when the electrics die you will be pleading for the 28 and 29k fleet 201 class locomotives are banned south of Bray on passenger services. 071 class can't do push pull. At this stage there is no one in Rosslare trained to drive either, and you would need a guard. In the time between now and December there is no feasible alternative, if there was we would be jumping up and down about it. The 2008/9 timetable depends on there been staff to run the extra trains which don't exist
__________________
Unhappy with new timetable - let us know |
13-07-2008, 11:25 | #7 |
Really Regular Poster
Join Date: Jan 2008
Location: Dublin
Posts: 309
|
A few valid points but i get the vibe that your just anti-mark3 and anti-locomotive.
Dosen't have to be a push-pull. 071 plus 5 mk3 carraiges would do nicely. |
14-07-2008, 18:42 | #8 |
Really Regular Poster
Join Date: Jan 2008
Location: Dublin
Posts: 309
|
|
16-07-2008, 12:16 | #9 |
Chairman/Publicity
Join Date: Dec 2005
Location: The Home of Hurling
Posts: 2,708
|
Are you going to go on it?
never mind, this thread is dead, baby. |
13-07-2008, 19:19 | #10 | |
Regular Poster
Join Date: Jan 2006
Posts: 115
|
Quote:
The speed of service can also have a huge effect on it's frequency. I'm not saying double the entire length of the track. However, I would suggest the following. Bray-Greystones could remain single track to cut costs. This stretch takes between 10 and 15 mintues to cover. From Greystones to Arklow/Gorey/Enniscorthy could be double tracked. From here, it would remain single track as far as Rosslare Europort. If this where the case, Gorey could potentially have an hourly service where every second train would be going to and from Rosslare thereby giving it a two hourly frequency similar to Sligo. I'm not sure when the last train would leave. The last stop for all DART services would have to be Bray to give way to the more frequent Commuter and Intercity Trains. It's just a suggestion. What do you think? |
|
13-07-2008, 19:34 | #11 | |
Really Regular Poster
Join Date: Mar 2007
Location: Rosslare Line
Posts: 600
|
Quote:
Im sure if your a user on the line its depends on the driver, I have witnessed Wicklow to Greystones 12mins and Wicklow-Rathdrum 11min and the hilly nature from Rathdrum to Arklow took just 14mins and from Arklow-Gorey 10mins on one occasion so my take would be to add 2mins for the train to get passengers on/off and continue which is enough lets be honest as the drivers dont usually wait for after 40secs... Just the section from Bray to Connolly gets to me every time!!! Its 13mins Bray to DunLaoghaire from there to Connolly 15mins that 30mins total I know Dart and commuter trains count Rosslare isnt a good service passenger wise but really have you ever wondered why... This line always gets neglected thats now I see it.... |
|
13-07-2008, 20:05 | #12 |
Member
Join Date: Dec 2005
Location: Clonsilla
Posts: 2,812
|
What is rumoured to be happening is fixed frequencies of every ten peak and fifteen off peak dart services with commuter and intercity services fitting in around it. Should be interesting.
Might be good news for maynooth passengers with possibly an extra peak service for two departing pearse Last edited by ThomasJ : 13-07-2008 at 20:27. |
13-07-2008, 20:27 | #13 | |
Regular Poster
Join Date: Jan 2006
Posts: 115
|
Quote:
|
|
11-07-2008, 20:52 | #14 | ||
Really Regular Poster
Join Date: Mar 2007
Location: Rosslare Line
Posts: 600
|
Quote:
Quote:
|
||
Thread Tools | Search this Thread |
Display Modes | |
|
|