Rail Users Ireland Forum

Go Back   Rail Users Ireland Forum > Irish Rail Customer Service Issues > Intercity and Regional > Galway - Limerick - Waterford - Rosslare
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read

Reply
 
Thread Tools Search this Thread Display Modes
Unread 27-06-2021, 16:04   #1
Eddie
Really Regular Poster
 
Join Date: Sep 2009
Posts: 258
Default

Quote:
Originally Posted by Mark Gleeson View Post
The line is not closing, its being suspended which is quite different. Independent engineering consultants will review the line on a regular basis. If the line is not maintained in line with the agreed standard (which will go further than Irish Rail's proposal to the NTA) Irish Rail will be required by contract to sort it out.
A couple of weeks ago, I took the first train of the day down from Dublin to Waterford and cycled to Rosslare, returning back to Dublin on the last train.

There are a couple of level crossings near Wellingtonbridge where my road route came close to the old railway line. I'm not sure what standard has to be maintained on this line, but from what I could see there were plenty of high weeds along the line and the level crossings were silted up - it's clearly a long time since a train went along this route to ensure its viability is maintained.

I'd prefer to see this route reinstated rather than turn it into another Greenway - the road route is quiet enough anyway. Some upgrade will definitely be required though.
Eddie is offline   Reply With Quote
Unread 02-07-2021, 10:03   #2
comcor
Really Regular Poster
 
Join Date: Dec 2005
Location: Cork-Dublin, Cork Commuter and occasionally DART and Dublin-Wexford
Posts: 855
Default

There was a weed-spraying train went along it a couple of months ago. I think it goes down twice a year. Earlier in the year, the road under the rail bridge by Duncormick station had a significant slippage on it. While the rail bridge itself seemed unaffected, I'm guessing it didn't get the level of inspection that there would have been if the rail line was active. More than likely if there are issues that would prevent the viability of any reopening, it will be unseen ones on the major engineering structures rather than weeds, which are easy enough to remove. The Barrow Bridge, as a particularly large and complex structure, would be the biggest area of concern
comcor is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 11:41.


Powered by vBulletin
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.