Old 16-07-2020, 21:26   #1
comcor
Really Regular Poster
 
Join Date: Dec 2005
Location: Cork-Dublin, Cork Commuter and occasionally DART and Dublin-Wexford
Posts: 855
Default

I would presume the mention of Cork, Limerick and Galway was a just new stations on existing lines. There have long been plans for stations at Blarney and Kilbarry between Cork and Mallow, and a P&R station on the Cobh/Midleton lines (although the site is now compromised). In Galway a station between Oranmore and Galway is often mentioned as a possibility. In Limerick there has been mention of a station at Moyross on the way to Ennis.

I don’t think any of the lines to Youghal, Tuam or Foynes are quick wins as they need significant investment.

There are mutterings of forcing a rail line to be built along side the M20 to get the Greens to agree to it, but building a line alongside a new motorway seems a sure fire way to undermine it before it gets built.
comcor is offline   Reply With Quote
Old 17-07-2020, 12:22   #2
dowlingm
Really Really Regluar Poster
 
dowlingm's Avatar
 
Join Date: Aug 2006
Location: Toronto, Canada
Posts: 1,371
Default

Quote:
Originally Posted by comcor View Post
I would presume the mention of Cork, Limerick and Galway was a just new stations on existing lines. There have long been plans for stations at Blarney and Kilbarry between Cork and Mallow, and a P&R station on the Cobh/Midleton lines (although the site is now compromised). In Galway a station between Oranmore and Galway is often mentioned as a possibility. In Limerick there has been mention of a station at Moyross on the way to Ennis.

I don’t think any of the lines to Youghal, Tuam or Foynes are quick wins as they need significant investment.

There are mutterings of forcing a rail line to be built along side the M20 to get the Greens to agree to it, but building a line alongside a new motorway seems a sure fire way to undermine it before it gets built.
Crusheen (between Ennis and Gort) is on the Network Statement as a forthcoming station

http://eiretrains.com/Photo_Gallery/...yStations.html
dowlingm is offline   Reply With Quote
Old 17-07-2020, 16:09   #3
comcor
Really Regular Poster
 
Join Date: Dec 2005
Location: Cork-Dublin, Cork Commuter and occasionally DART and Dublin-Wexford
Posts: 855
Default

I would have thought the last thing needed between Ennis and Athenry would be another station to slow services down more. At least with Moyross, you could serve it with trains only running between Limerick and Ennis.

Crusheen is small. For comparison's sake, this is a non-exhaustive list of towns, on or within 2km of a rail line, that are larger and don't have a station.

Mountrath
Kilmallock
Buttevant
Blarney
Cratloe
Caherconlish
Mooncoin
Mullinavat
Newcastle
Ferns
Dunleer
Castlebellingham

A couple of observations about that list
- There are way better candidates than Crusheen. Specifically, places that could drive commuter traffic, like Dunleer, Blarney or Newcastle.
- In the absence of designated stopping services outside urban areas, we could kill the already poor timings on our rail network
comcor is offline   Reply With Quote
Old 18-07-2020, 18:20   #4
dowlingm
Really Really Regluar Poster
 
dowlingm's Avatar
 
Join Date: Aug 2006
Location: Toronto, Canada
Posts: 1,371
Default

A halt wouldn’t do much harm if it was adjoining a PSR. Not sure if there is one in Crusheen. A station with a passing loop would inject flexibility into the timetable - but given the failure to build one straight away in Oranmore, to build one at all in Sixmilebridge, and the lifting of ones between Limerick Junction and Waterford, I don’t think we should hold our breath.

Moyross should have a 2 platform halt (“Musgrave Park/LIT”) and a single track one in Cratloe could be called “Bunratty (Cratloe)”

Killonan could have had one if Limerick bothered to develop a town around the junction together with a decent link road to Plassey.

Kilmallock is too close to Charleville; moving Charleville Station a bit north to be closer to Kilmallock’s catchment could work given that the existing station is remote, but with the loop it would likely be too expensive.

Doubt Mountrath would see a halt for 1800 people on a high speed section of the line unless Ballybrophy was closed and the Nenagh branch was reoriented via Borris in Ossory and points north as a third main track into Portlaoise which seems a bit unlikely to me...
dowlingm is offline   Reply With Quote
Old 20-07-2020, 21:06   #5
comcor
Really Regular Poster
 
Join Date: Dec 2005
Location: Cork-Dublin, Cork Commuter and occasionally DART and Dublin-Wexford
Posts: 855
Default

So the Cork proposals were presented to councilors this evening. It essentially amounts to five new stations (Blarney, Kilbarry, Dunkettle, Ballynoe, Carrigtwohill West) and electrification of the suburban rail network.

I don’t really understand why Ballynoe, which isn’t all that far from Rushbrooke and not Tivoli.

Regarding the diverged discussion, I’d actually be in favour of some rural stopping services. Something like a route that ran:-

Cork
Blarney
Mallow
Buttevant
Charleville
Kilmallock
Limerick junction
Limerick P&R (somewhere near where the rail line crosses the M7)
Limerick

You could them eliminate Charleville from Cork-Dublin services, but provide a better service as a result. Connections with Dublin-Cork trains at Limerixk Junction can then feed that route. However, it’s clearly not an option unless the fleet gets significantly expanded. Maybe if there’s further electrification around Dublin, some diesel railcars may be available.

Last edited by comcor : 20-07-2020 at 21:09.
comcor is offline   Reply With Quote
Old 22-07-2020, 09:57   #6
comcor
Really Regular Poster
 
Join Date: Dec 2005
Location: Cork-Dublin, Cork Commuter and occasionally DART and Dublin-Wexford
Posts: 855
Default

So apparently dual-tracking to Midleton was also included. Seems like a bit of a waste to me when the current track can handle 4 trains per hour each way and the current peak hour service is only twice per hour. If needed four trains an hour with larger capacity seems sufficient in the next 20 years. That would be a three-fold capacity increase.
comcor is offline   Reply With Quote
Old 23-07-2020, 08:14   #7
ACustomer
Really Regular Poster
 
Join Date: Jan 2006
Posts: 767
Default

Normally Midleton and Cobh services are provided by 2-car DMUs. All platforms can take 4 cars without any alteration. So the capacity of the existing hourly service could be doubled without extra fixed assets, or quadrupled by moving to a 4-car 30-minute interval service. And I daresay that extra peak hour services might easily provide even more capacity.
For all of this you will need more rolling stock. More track capacity would be a total waste of money. Services in the Mallow direction are another matter.
ACustomer is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 17:24.


Powered by vBulletin
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.