Default Minister for housing says all state properties, will be assessed for house building

http://www.irishtimes.com/news/socia...isis-1.2726365

Quote:
All State-owned lands, such as bus depots and Iarnród Éireann properties, will be assessed for their potential for house building, according to an early draft of the plan.

The plan will say all available State lands, on which imminent important infrastructural developments are not yet planned, should be put forward for housing where appropriate.
Your favorite potential station location is on the chopping block.

Last edited by platypusparcel : 19-07-2016 at 09:13.
platypusparcel is offline   Reply With Quote
Unread 19-07-2016, 09:47   #2
James Shields
Member
 
James Shields's Avatar
 
Join Date: Dec 2005
Location: Drogheda, Ireland
Posts: 1,275
Default

Not just potential stations, I would worry about alignments, and possible widening of existing alignments. A lot of land next to the Northern line was developed in the '90s and '00s that will make any future 4-tracking difficult, for example.

I expect the Metro North alignment is safe enough, but every effort should be made to protect alignment for future extension further north.

James
James Shields is offline   Reply With Quote
Unread 19-07-2016, 12:25   #3
Inniskeen
Really Regular Poster
 
Join Date: Oct 2010
Posts: 951
Default

Quote:
Originally Posted by James Shields View Post
Not just potential stations, I would worry about alignments, and possible widening of existing alignments. A lot of land next to the Northern line was developed in the '90s and '00s that will make any future 4-tracking difficult, for example.

I expect the Metro North alignment is safe enough, but every effort should be made to protect alignment for future extension further north.

James
Hugely important to protect alignments and land adjacent to the main routes which could be used for extra tracks.

Particularly important on the Northern line where IR, NTA etc appear to have been asleep on the job and as a consequence infill developments have been allowed to compromise future capacity.

If the height of ambition for heavy rail is to have everything trundling around at 20 mph then the current approach should work well enough although of course passengers travelling much more than 10 to 12 miles will probably do by road other than during periods of intense congestion.
Inniskeen is offline   Reply With Quote
Unread 19-07-2016, 13:22   #4
Jamie2k9
Really Really Regluar Poster
 
Join Date: Jun 2010
Posts: 2,146
Default

CIE surly don't have much land left outside Docklands and around Cork station, I don't see either been given profession for social housing nor any intention by Goverment to push for it.

Surly some legal avenue would be open to them as well?
Jamie2k9 is offline   Reply With Quote
Unread 19-07-2016, 13:47   #5
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

There are already plans for Cork and Dublin Docklands

Inchicore could be developed once the interconnector is complete

There is a massive amount of zoned land lying idle which cannot be built on until the rail service is improved. Hansfield, Adamstown, Kishogue etc.

The Cabra site was sold years ago, but land for a station was retained
Mark Gleeson is offline   Reply With Quote
Unread 19-07-2016, 14:53   #6
Jamie2k9
Really Really Regluar Poster
 
Join Date: Jun 2010
Posts: 2,146
Default

Quote:
There is a massive amount of zoned land lying idle which cannot be built on until the rail service is improved. Hansfield, Adamstown, Kishogue etc.
If it was improved I expect it still would not be developed for some time. What sort of service requirement is needed soon there will be 2 hourly service with 3 at peak times.

Quote:
The Cabra site was sold years ago, but land for a station was retained
If the planning system functioned then any application would be turned down because of the above requirement for good access to rail services.

Last edited by Jamie2k9 : 19-07-2016 at 15:22.
Jamie2k9 is offline   Reply With Quote
Unread 19-07-2016, 15:15   #7
berneyarms
Really Regular Poster
 
Join Date: Aug 2013
Posts: 602
Default

Quote:
Originally Posted by Mark Gleeson View Post
There are already plans for Cork and Dublin Docklands

Inchicore could be developed once the interconnector is complete

There is a massive amount of zoned land lying idle which cannot be built on until the rail service is improved. Hansfield, Adamstown, Kishogue etc.

The Cabra site was sold years ago, but land for a station was retained
Surely building the houses would mean de facto a case for an improved rail service and reinstatement of the 2700s to facilitate it.

To suggest that they can't build the houses due to a lack of trains is daft - the trains are there - they just need funding to operate them.
berneyarms is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 21:22.


Powered by vBulletin
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.