Default [21/11/2012]-All DART services Suspended

Tweeted by IR:

Quote:
All DART services suspended due to a tecnical fault. Dublin Bus honouring all rail tickets
Jamie2k9 is offline   Reply With Quote
Unread 21-11-2012, 20:49   #2
Jamie2k9
Really Really Regluar Poster
 
Join Date: Jun 2010
Posts: 2,146
Default

Update:

Quote:
DART services have resumed. Subject to some delays
There was 30 min delays earlier to North bound due to a train failure.
Jamie2k9 is offline   Reply With Quote
Unread 21-11-2012, 20:58   #3
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

Looks like a complete systems failure in Connolly CTC halted everything, only ever seen this once before
Mark Gleeson is offline   Reply With Quote
Unread 21-11-2012, 21:05   #4
Jamie2k9
Really Really Regluar Poster
 
Join Date: Jun 2010
Posts: 2,146
Default

Quote:
Looks like a complete systems failure in Connolly CTC halted everything, only ever seen this once before
Was that just DART or nationwide failure.
Jamie2k9 is offline   Reply With Quote
Unread 21-11-2012, 21:16   #5
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

Looks like something in CTC died and halted play

There are only things
1. Loss of the suburban CTC mainframes, there is backup, plus the local signalling can be put into automatic. The 1984 system covers the DART plus the bit to Broombridge+Portmarnock+Bray Head

2. Loss of the OHLE SCADA system, will mandate halt of all electric services until control is returned, likely the power will go off automatically, again there are backups

Looks like a progressive loss of CTC control

Last edited by Mark Gleeson : 21-11-2012 at 21:18.
Mark Gleeson is offline   Reply With Quote
Unread 21-11-2012, 21:53   #6
Jamie2k9
Really Really Regluar Poster
 
Join Date: Jun 2010
Posts: 2,146
Default

Just as it happend the 18.35 can to a stop near the crossing thats beig put into operation after 5 mins we moved and went through crossing with no barriers closed but staff stopping traffic and then done no more than 25mph to Thomstown then back to normaluntil another level crossing problem which resulted in a further crawl for a few miles.
Jamie2k9 is offline   Reply With Quote
Unread 21-11-2012, 22:13   #7
longword
Regular Poster
 
Join Date: Jan 2012
Posts: 33
Default

I thought it was something to do with the overhead electrics rather than command and control. The 20:13 Pearse to Drogheda ran close to schedule, but stopping at all the DART stations. About 10 minutes late by the end of its run.

There were no platform announcements while I was at Tara, but I did overhear an onboard PA on a passing DART that mentioned an electrical problem between Connolly and Clontarf.
longword is offline   Reply With Quote
Unread 21-11-2012, 22:21   #8
Inniskeen
Really Regular Poster
 
Join Date: Oct 2010
Posts: 951
Default

Quote:
Originally Posted by Mark Gleeson View Post
Looks like something in CTC died and halted play

There are only things
1. Loss of the suburban CTC mainframes, there is backup, plus the local signalling can be put into automatic. The 1984 system covers the DART plus the bit to Broombridge+Portmarnock+Bray Head

2. Loss of the OHLE SCADA system, will mandate halt of all electric services until control is returned, likely the power will go off automatically, again there are backups

Looks like a progressive loss of CTC control
Can' see that a failure of the OHLE SCADA system would have any effect on the actual power system itself, all that would happen is that the supervisory screens would go blank. No big deal really as the OHLE protectice systems would still operate.

All services indeed appear to have been suspended but there is absolutely no evidence that power was unavailable. The service was wound down in a controlled manner with all DART trains halted at stations.

Seem to have been several additional unrelated DART failures earlier this evening.
Inniskeen is offline   Reply With Quote
Unread 21-11-2012, 22:43   #9
Kilocharlie
Member
 
Join Date: Oct 2006
Posts: 395
Default

Quote:
Originally Posted by Jamie2k9 View Post
Just as it happend the 18.35 can to a stop near the crossing thats beig put into operation after 5 mins we moved and went through crossing with no barriers closed but staff stopping traffic and then done no more than 25mph to Thomstown then back to normaluntil another level crossing problem which resulted in a further crawl for a few miles.
perhaps related to this?
Quote:
Upcoming Service Alterations (Updated 16th November)

05 November 2012

Upcoming Service Alterations (Updated 16th November)

Due to Level Crossing works on the Waterford line between Kilkenny and Ballyhale from Monday 19th to Friday 23rd November, the following services may be delayed by 10 – 15 minutes:

Dublin/Waterford Services

All services in both directions.

Iarnród Éireann apologises for any inconvenience this may cause.
Kilocharlie is offline   Reply With Quote
Unread 21-11-2012, 23:18   #10
Jamie2k9
Really Really Regluar Poster
 
Join Date: Jun 2010
Posts: 2,146
Default

Dont think so as there has being no problems since monday at da crossing. This was a sudden stop and mannual barriers are usualy closed as back up to automatc ones. It dosnt explain why the 25mph crawl through two other crossings. We got an announsmentsaying due to signal problems we would be delayed and said sorry for the engoing problems since departure Heuston and we expect clearance shortly. It startrd minutes befuore IE tweeted about the Dart problems.
Jamie2k9 is offline   Reply With Quote
Unread 22-11-2012, 07:07   #11
Inniskeen
Really Regular Poster
 
Join Date: Oct 2010
Posts: 951
Default

DART off to a great start this morning - 0540 from Bray running 17 minutes late, expect consequent delays to northern line commuter services as late running 0700 from Malahide interferes with other services.
Inniskeen is offline   Reply With Quote
Unread 22-11-2012, 11:29   #12
Jamie2k9
Really Really Regluar Poster
 
Join Date: Jun 2010
Posts: 2,146
Default

Quote:
DART off to a great start this morning - 0540 from Bray running 17 minutes late, expect consequent delays to northern line commuter services as late running 0700 from Malahide interferes with other services.
07.00 from Malahide was canceled.
Jamie2k9 is offline   Reply With Quote
Unread 22-11-2012, 23:29   #13
karlr42
Member
 
Join Date: Mar 2009
Location: Clonsilla
Posts: 340
Default

Last DART services suspended tonight due to a technical fault, same thing I guess.
karlr42 is offline   Reply With Quote
Unread 23-11-2012, 07:04   #14
Inniskeen
Really Regular Poster
 
Join Date: Oct 2010
Posts: 951
Default

0630 from Drogheda picked up the displaced DART passengers at Malahide and Portmarnock, made an extra stop at Clongriffin and still arrived early in Connolly. Normally crawls behind the 0700.
Inniskeen is offline   Reply With Quote
Unread 23-11-2012, 09:29   #15
Mark Gleeson
Technical Officer
 
Mark Gleeson's Avatar
 
Join Date: Dec 2005
Location: Coach C, Seat 33
Posts: 12,669
Default

Yet another total CTC collapse last night
Mark Gleeson is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT. The time now is 15:55.


Powered by vBulletin
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.